Active Bid Solicitation

FORT PIERCE HARBOR MAINTENANCE DREDGING, ST. LUCIE COUNTY, FLORIDA

Solicitation W912EP26BA015 Notice ed73b5be1b484953a750a4dfd6a695a6

The agency is asking for bids, quotes, or proposals. Check the notice for instructions and the deadline.

No confirmed award in the records available to us. That does not establish that bidding is still open. Award records can lag. DoD award records lag about 90 days.

Sign in to get updates for this solicitation.

Open official notice on SAM.gov
PostedSep 21, 2026
Response deadlineOct 13, 2026 5:00 PM UTC
DepartmentDEPT OF DEFENSE
Set-aside Unrestricted Unrestricted. No set-aside.

Scope

Opportunity description

PROJECT DESCRIPTION: Project work includes maintenance dredging of Fort Pierce Harbor with excavated material being placed onto Fort Pierce Beach. Due to the extensive hardbottom areas located offshore of the fill area, offshore pipeline access to the beach site is prohibited.

Offloading the beach fill will be done inside the South Jetty of Fort Pierce Inlet, as shown on the drawings. A staging area and beach access to the beach placement area are located at the end of Seaway Drive and near the south jetty pumpout location.

Work also includes but is not limited to environmental and water quality monitoring, sea turtle trawl sweeping (hopper dredges only), screening, beach tilling, beach fill quality control, construction support, and vibration control and monitoring.

Work will be divided into a base and two options. BIDS DUE: 22 October 2026 at 1:00 PM EDT. NAICS CODE: 237990, OTHER HEAVY CIVIL ENGINEERING CONSTRUCTION. SMALL BUSINESS SIZE STANDARD: $37 million. TARGET PRICE RANGE: Between $5,000,000.00 and $10,000,000.00. PERIOD OF PERFORMANCE: The Contractor shall be required to (a) commence work under this contract within SIXTY (60) calendar days after the date the Contractor receives the Notice to Proceed (NTP), (b) prosecute the work diligently, and (c) complete the entire work ready for use, and be off the beach, not later than 30 May 2027, with 30 June 2027 for the entire contract work.

The time stated for completion shall include final cleanup of the premises. The completion date is based on the assumption that the successful offeror will receive the notice to proceed by 7 January 2027.

The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.

Timeline

Related notices

8 notices
  • Bid Solicitation Posted Oct 14, 2026

    No changes are visible in this extract. Check SAM.gov because the change may be in an attachment.

  • Bid Solicitation Posted Oct 7, 2026

    The response deadline moved to Oct 16, 2026 5:00 PM UTC. The description changed: PROJECT DESCRIPTION: Project work includes maintenance dredging of Fort Pierce Harbor with excavated material being pla…

  • Bid Solicitation Posted Sep 30, 2026

    No changes are visible in this extract. Check SAM.gov because the change may be in an attachment.

  • Bid Solicitation Posted Sep 23, 2026

    The description changed: PROJECT DESCRIPTION: Project work includes maintenance dredging of Fort Pierce Harbor with excavated material being pla…

  • Bid Solicitation Posted Sep 21, 2026 You are viewing this

    The response deadline moved to Oct 13, 2026 5:00 PM UTC.

  • Bid Solicitation Posted Sep 18, 2026

    No changes are visible in this extract. Check SAM.gov because the change may be in an attachment.

  • Bid Solicitation Posted Sep 10, 2026

    This posting became a solicitation. The description changed: PROJECT DESCRIPTION: Project work includes maintenance dredging of Fort Pierce Harbor with excavated material being pla…

  • Early lead Presolicitation Posted Aug 27, 2026

    First posting.