rfpseek Federal opportunities
Active Bid Solicitation

RIO DE LA PLATA FLOOD CONTROL PROJECT, SUPPLEMENTAL CONTRACT 1 PROJECT LOCATION: DORADO AND TOA BAJA, PUERTO RICO

Solicitation W51DQV26RA002 Notice d86878b8aa904bca9da05417686cef8b

The agency is asking for bids, quotes, or proposals. Check the notice for instructions and the deadline.

No confirmed award in the records available to us. That does not establish that bidding is still open. Award records can lag. DoD award records lag about 90 days.

Sign in to get updates for this solicitation.

Open official notice on SAM.gov
PostedOct 14, 2026
Response deadlineOct 27, 2026 6:00 PM UTC
DepartmentDEPT OF DEFENSE
Set-aside Unrestricted Unrestricted. No set-aside.
Posted Oct 14, 2026; due Oct 27, 2026. That is 13 days to respond.

Scope

Opportunity description

THIS REQUEST FOR PROPOSAL (RFP) WILL RESULT IN AWARD OF ONE (1) FIRM-FIXED-PRICE (FFP) DESIGN-BID-BUILD (DBB) CONSTRUCTION CONTRACT. GENERAL SCOPE OF WORK: REFER TO SECTION 00 31 32.THE NORTH AMERICAN INDUSTRY CLASSIFICATION (NAICS) IS CODE 237990, WITH A SMALL BUSINESS STANDARD SIZE STANDARD OF $45 MILLION.PROJECT MAGNITUDE: FOR INFORMATIONAL AND BONDING PURPOSES, THE ESTIMATED MAGNITUDE OF THIS CONSTRUCTION PROJECT IS BETWEEN $250,000,000 AND $350,000,000.

AN ORGANIZED SITE-VISIT HAS BEEN SCHEDULED. SEE SECTION 00 73 00 FOR DETAILS.*** OFFERORS ARE NOTIFIED THAT ALL REAL ESTATE RIGHTS HAVE NOT YET BEEN OBTAINED FOR ACCESS TO THE ENTIRE CONSTRUCTION SITE.

OUTSTANDING RIGHTS NEEDED TO PROVIDE THE CONTRATOR ACCESS TO CONTRUCT THE PROJECT WILL BE OBTAINTED BEFORE ISSUANCE OF THE FULL NOTICE TO PROCEED. ***NOTICE: Amendment 0001 was posted on July 2, 2026.

Amendment 0002 was posted on August 4, 2026. Amendment 0003 was posted on August 13, 2026. Amendment 0004 was posted on September 3, 2026. Amendment 0005 was posted on October 14, 2026. To access the official Solicitation, Solicitation Supporting Documents, and Amendments click on PIEE Solicitation Module Link for W51DQV26RA002 link.

You will be directed to the PIEE system where you can scroll down to the bottom of page and find all the documents that are available for this solicitation.

Timeline

Related notices

8 notices
  • Bid Solicitation Posted Oct 14, 2026 You are viewing this

    The description changed: THIS REQUEST FOR PROPOSAL (RFP) WILL RESULT IN AWARD OF ONE (1) FIRM-FIXED-PRICE (FFP) DESIGN-BID-BUILD (DBB) CONSTRUCT…

  • Bid Solicitation Posted Sep 3, 2026

    The response deadline moved to Oct 27, 2026 6:00 PM UTC. The description changed: THIS REQUEST FOR PROPOSAL (RFP) WILL RESULT IN AWARD OF ONE (1) FIRM-FIXED-PRICE (FFP) DESIGN-BID-BUILD (DBB) CONSTRUCT…

  • Bid Solicitation Posted Aug 13, 2026

    The response deadline moved to Sep 15, 2026 6:00 PM UTC. The description changed: THIS REQUEST FOR PROPOSAL (RFP) WILL RESULT IN AWARD OF ONE (1) FIRM-FIXED-PRICE (FFP) DESIGN-BID-BUILD (DBB) CONSTRUCT…

  • Bid Solicitation Posted Aug 4, 2026

    No changes are visible in this extract. Check SAM.gov because the change may be in an attachment.

  • Bid Solicitation Posted Aug 4, 2026

    The description changed: THIS REQUEST FOR PROPOSAL (RFP) WILL RESULT IN AWARD OF ONE (1) FIRM-FIXED-PRICE (FFP) DESIGN-BID-BUILD (DBB) CONSTRUCT…

  • Bid Solicitation Posted Jul 2, 2026

    The response deadline moved to Aug 19, 2026 2:00 PM UTC. The description changed: THIS REQUEST FOR PROPOSAL (RFP) WILL RESULT IN AWARD OF ONE (1) FIRM-FIXED-PRICE (FFP) DESIGN-BID-BUILD (DBB) CONSTRUCT…

  • Bid Solicitation Posted Jun 29, 2026

    The description changed: June 26 2026 Notice: Site-Visit Sign-In Sheet and Power Point Presentation has been uploaded to this notice.

  • Bid Solicitation Posted May 20, 2026

    First posting.