rfpseek Federal opportunities
Active Bid Solicitation

VGLZ 242009 Repair and Seal Floors in B825

Solicitation W50S8526BA004 Notice 91321c4529ed4b769e3b9fa661bf2448

The agency is asking for bids, quotes, or proposals. Check the notice for instructions and the deadline.

No confirmed award in the records available to us. That does not establish that bidding is still open. Award records can lag. DoD award records lag about 90 days.

Sign in to get updates for this solicitation.

Open official notice on SAM.gov
PostedJul 16, 2026
Due dateJul 30, 2026 4:00 PM UTC
DepartmentDEPT OF DEFENSE
Set-aside Small Business Set Aside - Total (SBA) SBA size status under NAICS 238390 is unknown. Check the solicitation's size standard.
Posted Jul 16, 2026; due Jul 30, 2026. That is 14 days to respond.

Scope

Opportunity description

The work shall be in strict compliance with this SOW, the project specifications, and the project drawings. Sections of this SOW may supersede the requirements found in the specifications, in which case, the more stringent/higher quality requirements shall apply.

All work will be coordinated with Base Operations. The Contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to repair and seal the floors in building 825.

Caulk all expansion joints and visible cracks as shown in the attached project drawings, in accordance with this Statement of Work (SOW). The contractor shall perform to the standards outlined in the contract.16JUL2026 AMENDMENT 0001 corrects an administrative Site Visit date error.

REMINDER: Acknowledge all amendments in your Bid Package.

Timeline

Related notices

12 notices
  • Bid Solicitation Posted Sep 9, 2026

    The description changed: The work shall be in strict compliance with this SOW, the project specifications, and the project drawings.

  • Bid Solicitation Posted Sep 3, 2026

    No changes are visible in this extract. Check SAM.gov because the change may be in an attachment.

  • Bid Solicitation Posted Sep 3, 2026

    The description changed: The work shall be in strict compliance with this SOW, the project specifications, and the project drawings.

  • Bid Solicitation Posted Aug 24, 2026

    No changes are visible in this extract. Check SAM.gov because the change may be in an attachment.

  • Bid Solicitation Posted Aug 24, 2026

    The response deadline moved to Sep 9, 2026 4:00 PM UTC. The description changed: The work shall be in strict compliance with this SOW, the project specifications, and the project drawings.

  • Bid Solicitation Posted Aug 21, 2026

    No changes are visible in this extract. Check SAM.gov because the change may be in an attachment.

  • Bid Solicitation Posted Aug 21, 2026

    The description changed: The work shall be in strict compliance with this SOW, the project specifications, and the project drawings.

  • Bid Solicitation Posted Aug 10, 2026

    The response deadline moved to Aug 26, 2026 4:00 PM UTC. The description changed: The work shall be in strict compliance with this SOW, the project specifications, and the project drawings.

  • Bid Solicitation Posted Jul 27, 2026

    The description changed: The work shall be in strict compliance with this SOW, the project specifications, and the project drawings.

  • Bid Solicitation Posted Jul 16, 2026 You are viewing this

    The description changed: The work shall be in strict compliance with this SOW, the project specifications, and the project drawings.

  • Bid Solicitation Posted Jul 7, 2026

    This posting became a solicitation. A response deadline was added.

  • Early lead Presolicitation Posted Jun 11, 2026

    First posting.