rfpseek Federal opportunities
Active Bid Solicitation

VGLZ 242009 Repair and Seal Floors in B825

Solicitation W50S8526BA004 Notice 337f0f1805a84c2186ff900460a82304

The agency is asking for bids, quotes, or proposals. Check the notice for instructions and the deadline.

No confirmed award in the records available to us. That does not establish that bidding is still open. Award records can lag. DoD award records lag about 90 days.

Sign in to get updates for this solicitation.

Open official notice on SAM.gov
PostedSep 3, 2026
Due dateSep 9, 2026 4:00 PM UTC
DepartmentDEPT OF DEFENSE
Set-aside Small Business Set Aside - Total (SBA) SBA size status under NAICS 238390 is unknown. Check the solicitation's size standard.
Posted Sep 3, 2026; due Sep 9, 2026. That is 6 days to respond.

Scope

Opportunity description

The work shall be in strict compliance with this SOW, the project specifications, and the project drawings. Sections of this SOW may supersede the requirements found in the specifications, in which case, the more stringent/higher quality requirements shall apply.

All work will be coordinated with Base Operations. The Contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to repair and seal the floors in building 825.

Caulk all expansion joints and visible cracks as shown in the attached project drawings, in accordance with this Statement of Work (SOW). The contractor shall perform to the standards outlined in the contract.16JUL2026 AMENDMENT 0001 corrects an administrative Site Visit date error.

REMINDER: Acknowledge all amendments in your Bid Package. Update 27 July 2026: Site Visit sign in sheet and slides added to solicitation package. Update 28 July 2026: This update adds in additional drawing and room photos to further define scope of work, adds in additional site visit day and time for 4 August 2026 at 2:00pm EDT, and extends the bid due date to 12 August 2026 at 12:00pm EDT.

Please resubmit base access request if planning on attending second site visit. Please acknowledge all solicitation amendments on the SF1442. Update 10 August 2026: This update extends the bid opening date from 12 August 2026 at 12:00PM EDT to Wednesday 26 August 2026 at 12:00PM EDT.

This update also adds in another site visit for Wednesday 19 August 2026 at 2:00PM EDT. Please access original solicitation posting to access Base Access Request Form to attend site visit. Update 21 August 2026: This update adds in the 19 August 2026 site visit sign in sheet and the presentation slides.

This update adds in an updated wage determination and bid extension due to outstanding RFIs. Bids are now due on Wednesday 9 September 2026 at 12:00pm EDT. Update 3 September 2026: This update adds in RFIs asked after the last site visit.

Bid due date is not extended. Bids are still due on Wednesday 9 September 2026 at 12:00pm EDT.

Timeline

Related notices

12 notices
  • Bid Solicitation Posted Sep 9, 2026

    The description changed: The work shall be in strict compliance with this SOW, the project specifications, and the project drawings.

  • Bid Solicitation Posted Sep 3, 2026 You are viewing this

    No changes are visible in this extract. Check SAM.gov because the change may be in an attachment.

  • Bid Solicitation Posted Sep 3, 2026

    The description changed: The work shall be in strict compliance with this SOW, the project specifications, and the project drawings.

  • Bid Solicitation Posted Aug 24, 2026

    No changes are visible in this extract. Check SAM.gov because the change may be in an attachment.

  • Bid Solicitation Posted Aug 24, 2026

    The response deadline moved to Sep 9, 2026 4:00 PM UTC. The description changed: The work shall be in strict compliance with this SOW, the project specifications, and the project drawings.

  • Bid Solicitation Posted Aug 21, 2026

    No changes are visible in this extract. Check SAM.gov because the change may be in an attachment.

  • Bid Solicitation Posted Aug 21, 2026

    The description changed: The work shall be in strict compliance with this SOW, the project specifications, and the project drawings.

  • Bid Solicitation Posted Aug 10, 2026

    The response deadline moved to Aug 26, 2026 4:00 PM UTC. The description changed: The work shall be in strict compliance with this SOW, the project specifications, and the project drawings.

  • Bid Solicitation Posted Jul 27, 2026

    The description changed: The work shall be in strict compliance with this SOW, the project specifications, and the project drawings.

  • Bid Solicitation Posted Jul 16, 2026

    The description changed: The work shall be in strict compliance with this SOW, the project specifications, and the project drawings.

  • Bid Solicitation Posted Jul 7, 2026

    This posting became a solicitation. A response deadline was added.

  • Early lead Presolicitation Posted Jun 11, 2026