Government Owned Pre-Engineered Steel Building Erection

Solicitation W9126G26QA113 Notice fa0a4e6c9b1d48ec923927a288ce6c23

The agency is asking for bids, quotes, or proposals. Check the notice for instructions and the deadline.

No confirmed award in the records available to us. That does not establish that bidding is still open. Award records can lag. DoD award records lag about 90 days.

Sign in to get updates for this solicitation.

Open official notice on SAM.gov
PostedAug 28, 2026
Due dateSep 14, 2026 4:00 PM UTC
DepartmentDEPT OF DEFENSE
Set-aside Small Business Set Aside - Total (SBA) SBA size status under NAICS 236220 is unknown. Check the solicitation's size standard.

Scope

Opportunity description

SUBJECT: GOVERNMENT OWNED, PRE-ENGINEERED STEEL BUILDING ERECTION, GRANGER LAKE, TEXAS. SOLICITATION NUMBER: W9126G26QA113; SOLICITATION CLOSING DATE: 14 SEPTEMBER 2026. OFFERS DUE BY 10:00 AM CST. ---------- DESCRIPTION: The contractor shall furnish all tools, equipment, labor, and supervision to erect a Government furnished pre-engineered steel building as shown in Statement of Work (SOW) Attachment 2 and in accordance with SOW Section 13 34 19 METAL BUILDING SYSTEMS.

Materials required for the complete erection of the pre-engineered steel building not listed in SOW Attachment 1 shall be furnished by the Contractor and submitted to the COR for approval. Prior to erection, Contractor shall examine the concrete foundation and masonry bearing surfaces, anchor bolt size and placement, survey slab elevation, locations of bearing plates, and other embedments to receive structural framing with the metal building manufacturers templates and drawings as detailed in the SOW before erecting any steel components for compliance with requirements for installation tolerances and other conditions affecting performance of the Work.

Erect metal building system according to manufacturers written erection instructions, approved shop drawings and other erection documents in accordance with MBMA MBSM - Metal Building Systems Manual.

Contractor shall perform all work in accordance with the SOW and the terms of the contract.

Timeline

Related notices

4 notices
  • Award Award Notice Posted Sep 29, 2026 SYNOPSIS OF AWARD FOR GRANGER SHOP ERECTION

    This posting became an award notice. The response deadline was removed.

  • Bid Solicitation Posted Sep 10, 2026

    The description changed: Solicitation W9126G26QA113 is hereby amended for the following: 1.

  • Bid Solicitation Posted Aug 28, 2026 You are viewing this

    This posting became a solicitation. A response deadline was added.

  • Early lead Presolicitation Posted Aug 13, 2026

    First posting.