rfpseek Federal opportunities
Active Early lead Sources Sought

KC-135 Center Console Refresh (CCR) Revision 2

Solicitation FA8105_CCR_Rev2 Notice eed4b4efbdf24a1c8cd1a8c81fb407cb

The agency is researching the market or planning a purchase. A response is not a bid.

Sign in to get updates for this solicitation.

Open official notice on SAM.gov
PostedSep 25, 2026
Response deadlineSep 15, 2026 9:00 PM UTC
DepartmentDEPT OF DEFENSE
Set-aside Unrestricted Unrestricted. No set-aside.

Scope

Opportunity description

25 Sep 26 Responses to questions have been attache. The Government is working on responses to the remaining submitted questions and will be posting them as soon as possible. 31 Aug 26 Added two documents to the Bidder's Library - Projected KC-135 modifications during CCR install and Rev D of Attitude Plate. 24 Aug 26 Updating the Q&A with Government responses. 14 Aug 26 Updating the Q&A with Government responses. 6 Aug 26 Updating the Q&A with Government response. 28 Jul 26 Updating the Q&A with Government responses.

The resulting solicitation Amendment 01 will be posted under the Solicitation notice for KC-135 Center Console Refresh (CCR) Revision 2. 24 Jul 26 Updating the Q&A with Government responses. This should address all open questions. 22 Jul 26 Updating the Q&A with Government response. 09 Jul 26 Updating the bidder's library to include two documents referenced in the system engineerying plan (SEP). 1 Jul 26 The remaining unanswered Q&A questions from industry have been addressed and uploaded by the Government. 24 June 26- Updated and attached the Q&A document with recent questions from Industry and responses from the Government, The few remaining unanswered questions will be uploaded next week. 03 June 26 - SPECIAL ANNOUNCEMENT To ensure the integrity of the procurement process, fair and open competition, and compliance with the Federal Acquisition Regulation (FAR), all prospective offerors are hereby notified of the following protocols: The PCO is the only individual authorized to clarify requirements, answer questions, accept recommendations, or bind the Government regarding this acquisition.

Vendors are asked to not use higher-level leadership meetings, technical exchanges, or informal discussions with Government personnel to bypass the PCO. Any procurement-related topics raised in these forums will not be addressed, and personnel are being instructed to immediately redirect the vendor to the PCO.

All questions, comments, and recommendations must be submitted in writing directly to the PCO, brandi.shelden@us.af.mil 28 May 26 Updated and attached the Q&A document with recent questions from Industry and responses from the Government 26 May 26 Removed previous SRD and added a copy without password requirement.

Updated Draft Solicitation to searchable format. 21 May 26 Uploaded Memo for Draft RFP and timeline updates. 11 May 26 Uploaded the block 45 Electrical Loads Analysis 06 May 26 Updated and attached the Q&A document with recent questions from Industry and responses from the Government Removed and replaced the KC-135 CCR Baseline Configuration pdf. 05 May 26 Added KC-135 CCR Baseline Configuration to Bidder's Library Added TO 00-5-16 to Bidder's Library Added In Person Industry Day Measurements for KC-135 CCR Memo 28 Apr 26 Added In Person Industry Day Pictures KC-135 CCR Memo 23 April 2026 The following documents have been deleted due to non-applicability and/or being outdated. (CUI) AFRL-STO MBSE Style Guide v0.2.pdf OMG SysML Ver 1.7.pdf The following document has been uploaded (U) AFRL MBSE Style Guide v2-1 ------------------------------------------------------------------ 15 April 2026 Updated the Q&A documents for SOW, SRD, and Industry Day with Government responses. ------------------------------------------------------------------ 07 April 2026 NOTICE: AIRCRAFT TOUR ACCESS INFORMATION The Government is requesting the following arrival times for all attendees participating in the upcoming Aircraft Tour:

  • Non?CAC Holders: Please arrive at the Tinker AFB Visitor’s Center at 6:00 a.m. to allow sufficient time for vetting and base access processing.
  • CAC Holders: Please arrive at the Visitor’s Center at 7:30 a.m. for check?in prior to the tour. Important Reminder: Tinker Air Force Base has discontinued the Trusted Traveler Program. All individuals entering the installation, including those with CACs, must present a valid form of identification at the gate. Please plan accordingly to avoid delays. The tour is scheduled to conclude by 4:00 p.m CST ------------------------------------------------------------------ 03 April 2026 The Government is providing the following documents: The Q&As from the questions asked during the Virtual Industry Day and the one?on?ones held in March 2026 Responses to a portion of the questions submitted separately by industry; responses to the remaining questions will be posted at a later time Information for the Aircraft Tour Additional documents for the Bidder’s Library See attachments: “CUI_Industry Day 1 and 2 Q&A” “CUI KC?135 CCR Industry Day Responses” “Tinker PDM Aircraft Tour for KC?135 CCR” ------------------------------------------------------------------ 27 March 2026 CCR Virtual Industry Day -25 March 2026: Charts and Minutes for Industry The Goverment is providing the charts presented during the Virtual Industry Day held on 25 March 2026, along with the meeting minutes from the session. See attachment: "CUI KC-135 CCR Industry Day Slides and Meeting Minutes" ------------------------------------------------------------------ 19 March 2026 Invitations for the morning session of the KC-135 Center Console Refresh Industry Day have been sent. If you RSVP'd and have not yet received your invitation, please contact the Contracting Officer, Ms. Brandi Shelden. Due to the high volume of responses, additional individual sessions will be held on Thursday, March 26. Invitations for individual sessions will be sent out in the coming days. 17 March 2026 NOTICE REGARDING DOCUMENT ACCESS Several documents that were previously located in the controlled section have been moved to the public (uncontrolled) section. These documents are identical to the original versions, and no updates or changes have been made. ------------------------------------------------------------------ 16 March 2026 INDUSTRY DAY SCHEDULING: The Government is finalizing preparations for the upcoming Industry Day. As part of this process, please update your RSVP to state whether or not you are interested in participating in a one-on-one afternoon session. This information is required for scheduling purposes. ------------------------------------------------------------------ 10 March 2026 The Government wants to notify offerors that the KC-135 Center Console Refresh (CCR) Revision 2 program has uploaded the Excel Pricing Workbooks for both Prime and Subcontractor, and has updated the draft solicitation, including revisions to Section L and Section M. Specifically: Draft Solicitation: New CDRLs have been added to CLINs X0001, X0001AA, X0001AF and X0020; additionally, the proposal response due date has been updated to 31 July 2026. Section L: Paragraph 3.8.2 has been updated, and section 7.0 pricing has been added. Section M: Section 2.5 Pricing has been added. All updated attachments have been uploaded and are available in the "Attachments/Links" section. No additional attachments are anticipated at this time. See attachments: "DRAFT Solicitation - FA810526RB001" "Attachment 4 - DRAFT CCR Section L - Instructions to Offerors" "Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award" "ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME" "ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB" ------------------------------------------------------------------ 03 March 2026 The DRAFT Statement of Work (SOW) and System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded. See attachments: "Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW)" "Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD" ------------------------------------------------------------------ 27 February 2026 The DRAFT Section L and Section M for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded. See attachments: "Attachment 4 - DRAFT CCR Section L - Instructions to Offerors" "Attachment 5 - DRAFT CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb" ------------------------------------------------------------------ 18 February 2026 Eighteen Technical Orders (TOs) have been uploaded. Additional documents may be posted as they become available. ------------------------------------------------------------------ 17 February 2026 Updated non-CUI schedule for Industry: CCR plans to release Draft RFP – end of month February 2026 followed by an Industry Day in March 2026. Full RFP release is currently expected May 2026. ------------------------------------------------------------------ 05 February 2026 Added document "(CUI) KC-135 SCG Final Oct 2022" ------------------------------------------------------------------ 13 January 2026 CCR Response to Industry Questions The Goverment is providing answers to the SRD and SOW questions submitted by industry. These documents will be updated with additional questions and responses upon completion. See attachments: "(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26" "(CUI) FA8105_CCR_Rev2 RFI's SRD Responses" "(CUI) FA8105_CCR_Rev2 RFI's SOW Responses" ------------------------------------------------------------------ 17 December 2025 CCR Virtual Industry Day -2 April 2025: Charts for Industry The Goverment is providing the charts presented during the Virtual Industry Day held on April 2, 2025. See attachments: "(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25" "(CUI) CCR Industry Day" ------------------------------------------------------------------ 5 December 2025 REQUEST FOR INFORMATION (RFI) 3 The Goverment is seeking industry input concerning contract type and standard compliance. See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3" for details. ------------------------------------------------------------------ 21 November 2025 The DRAFT Statement of Work (SOW) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments. See attachment "CUI Draft SOW KC-135 CCR Rev 2" for details. ------------------------------------------------------------------ 19 November 2025 An update has been added for the Center Console Refresh Revision 2 effort. See attachment "(CUI) Update KC-135 CCR 19 Nov 25" for details. ------------------------------------------------------------------ 14 November 2025 The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments. See attachments: "(CUI) Draft SRD KC-135 CCR Memo 14Nov25" "(CUI) DRAFT KC-135 CCR Revision 2 SRD" ------------------------------------------------------------------ 29 September 2025 Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for review. Please continue to review the KC-135 Center Console Refresh (CCR) Revision 2 program notices for updates. ------------------------------------------------------------------- 26 September 2025 The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments. See attachments: "(CUI) Draft SRD KC-135 CCR Memo Signed" "(CUI) DRAFT KC-135 CCR SRD" ------------------------------------------------------------------- 28 August 2025 An update has been added for the Center Console Refresh Revision 2 effort. See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. ------------------------------------------------------------------- 8 August 2025 Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7". Updated PCO from Russell Watson to Brandi Shelden. ------------------------------------------------------------------- 18 July 2025 Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)". The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days. ------------------------------------------------------------------- 15 July 2025 Partial Bidder's Library uploaded to give Industry access to data. Additional documents will be uploaded as they become available. No responses are requested at this time. ---------------------------------------------------------------------- 2 July 2025 REQUEST FOR INFORMATION (RFI) 2 The Goverment is seeking additional information concerning incentives and CPIF type contract. See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. ------------------------------------------------------------------------ 6 June 2025 Added additional Q&A from 2 April 2025 virtual Industry Day. Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025" 14 April 2025 Added Q&A from 2 April 2025 virtual Industry Day. Added a PDF version of the Q&A due to issues with opening the Word version. 07 March 2025 KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS. This will include a presentation and Q&A session followed by one-on-one sessions. One-on-One Session Schedule: 1000-1100 1100-1200 1300-1400 1400-1500 1500-1600 If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s). Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite. All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov. The Government requests that only non?proprietary information be submitted in response to this Virtual Industry Day. ------------------------------------------------------------------------------------------------ 21 February 2025 Updated RFI to extend response date to 24 March 2025 from 3 March 2025. REQUEST FOR INFORMATION (RFI) This is an RFI for market research purposes issued by the C/KC? 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB). See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Timeline

Related notices

105 notices
  • Early lead Sources Sought Posted Oct 16, 2026

    The description changed: 16 Oct 26 Updating the Q&A with Government responses.

  • Early lead Sources Sought Posted Oct 14, 2026

    This posting became a sources sought. The response deadline moved to Sep 15, 2026 9:00 PM UTC.

  • Bid Solicitation Posted Oct 7, 2026

    The description changed: 07 Oct 26 Amendment 07 was issued to incorporate the attachments inadvertently left off from Amendment 06.

  • Bid Solicitation Posted Oct 7, 2026

    The description changed: 07 Oct 26 Amendment 07 was issued to incorporate the attachments inadvertently left off from Amendment 06.

  • Bid Solicitation Posted Oct 1, 2026

    The response deadline moved to Nov 9, 2026 6:00 PM UTC.

  • Bid Solicitation Posted Oct 1, 2026

    This posting became a solicitation. The response deadline moved to Nov 2, 2026 6:00 PM UTC.

  • Early lead Sources Sought Posted Sep 30, 2026

    The description changed: 30 Sep 26 Upon additional market research, some responses to previous questions have been revised.

  • Early lead Sources Sought Posted Sep 25, 2026 You are viewing this

    This posting became a sources sought. The response deadline moved to Sep 15, 2026 9:00 PM UTC.

  • Bid Solicitation Posted Sep 17, 2026

    The description changed: 17 Sept 26 The conformed contract, incorporating Amendments 01 through 04, is now available.

  • Bid Solicitation Posted Sep 3, 2026

    This posting became a solicitation. The response deadline moved to Nov 2, 2026 6:00 PM UTC.

  • Early lead Sources Sought Posted Aug 31, 2026

    This posting became a sources sought. The response deadline moved to Sep 15, 2026 9:00 PM UTC.

  • Bid Solicitation Posted Aug 31, 2026

    This posting became a solicitation. The response deadline moved to Nov 2, 2026 6:00 PM UTC.

  • Early lead Sources Sought Posted Aug 24, 2026

    This posting became a sources sought. The response deadline moved to Sep 15, 2026 9:00 PM UTC.

  • Bid Solicitation Posted Aug 24, 2026

    This posting became a solicitation. The response deadline moved to Oct 15, 2026 9:00 PM UTC.

  • Early lead Sources Sought Posted Aug 14, 2026

    This posting became a sources sought. The response deadline moved to Sep 15, 2026 9:00 PM UTC.

  • Bid Solicitation Posted Aug 12, 2026

    The response deadline moved to Oct 15, 2026 9:00 PM UTC.

  • Bid Solicitation Posted Aug 12, 2026

    This posting became a solicitation. The response deadline moved to Oct 13, 2026 9:00 PM UTC.

  • Early lead Sources Sought Posted Aug 6, 2026

    This posting became a sources sought. The response deadline moved to Sep 15, 2026 9:00 PM UTC.

  • Bid Solicitation Posted Jul 28, 2026

    This posting became a solicitation. The response deadline moved to Oct 13, 2026 9:00 PM UTC.

  • Early lead Sources Sought Posted Jul 28, 2026

    The description changed: 28 Jul 26 Updating the Q&A with Government responses.

  • Early lead Sources Sought Posted Jul 24, 2026

    The description changed: 24 Jul 26 Updating the Q&A with Government responss.

  • Early lead Sources Sought Posted Jul 22, 2026

    This posting became a sources sought. The response deadline moved to Sep 15, 2026 9:00 PM UTC.

  • Bid Solicitation Posted Jul 10, 2026

    No changes are visible in this extract. Check SAM.gov because the change may be in an attachment.

  • Bid Solicitation Posted Jul 10, 2026

    This posting became a solicitation. The response deadline moved to Oct 13, 2026 9:00 PM UTC.

  • Early lead Sources Sought Posted Jul 9, 2026

    The description changed: 09 Jul 26 Updating the bidder's library to include two documents referenced in the system engineerying plan (SEP).

  • Early lead Sources Sought Posted Jul 1, 2026

    The description changed: 1 Jul 26 The remaining unanswered Q&A questions from industry have been addressed and uploaded by the Government.

  • Early lead Sources Sought Posted Jun 24, 2026

    The description changed: 24 June 26- Updated and attached the Q&A document with recent questions from Industry and responses from the Government…

  • Early lead Sources Sought Posted Jun 3, 2026

    The description changed: 03 June 26 - SPECIAL ANNOUNCEMENT To ensure the integrity of the procurement process, fair and open competition, and co…

  • Early lead Sources Sought Posted May 28, 2026

    The description changed: 28 May 26 Updated and attached the Q&A document with recent questions from Industry and responses from the Government 2…

  • Early lead Sources Sought Posted May 26, 2026

    The description changed: 26 May 26 Removed previous SRD and added a copy without password requirement.

  • Early lead Sources Sought Posted May 26, 2026

    No changes are visible in this extract. Check SAM.gov because the change may be in an attachment.

  • Early lead Sources Sought Posted May 26, 2026

    The description changed: 26 May 26 Removed previous SRD and added a copy without password requirement 21 May 26 Uploaded Memo for Draft RFP and …

  • Early lead Sources Sought Posted May 21, 2026

    No changes are visible in this extract. Check SAM.gov because the change may be in an attachment.

  • Early lead Sources Sought Posted May 21, 2026

    This posting became a sources sought. The description changed: 21 May 26 Uploaded Memo for Draft RFP and timeline updates.

  • Early lead Presolicitation Posted May 20, 2026

    The description changed: Contracting Office: AFLCMC/WLTK Legacy Tankers Contracting Tinker AFB PCO: Brandi Shelden, brandi.

  • Early lead Presolicitation Posted May 18, 2026

    This posting became a presolicitation. The response deadline moved to Sep 15, 2026 9:00 PM UTC.

  • Early lead Sources Sought Posted May 11, 2026

    The description changed: 11 May 26 Uploaded the block 45 Electrical Loads Analysis 06 May 26 Updated and attached the Q&A document with recent q…

  • Early lead Sources Sought Posted May 7, 2026

    No changes are visible in this extract. Check SAM.gov because the change may be in an attachment.

  • Early lead Sources Sought Posted May 7, 2026

    No changes are visible in this extract. Check SAM.gov because the change may be in an attachment.

  • Early lead Sources Sought Posted May 6, 2026

    No changes are visible in this extract. Check SAM.gov because the change may be in an attachment.

  • Early lead Sources Sought Posted May 6, 2026

    No changes are visible in this extract. Check SAM.gov because the change may be in an attachment.

  • Early lead Sources Sought Posted May 6, 2026

    No changes are visible in this extract. Check SAM.gov because the change may be in an attachment.

  • Early lead Sources Sought Posted May 6, 2026

    The description changed: 06 May 26 Updated and attached the Q&A document with recent questions from Industry and responses from the Government R…

  • Early lead Sources Sought Posted May 6, 2026

    The description changed: 06 May 26 Removed and replaced the KC-135 CCR Baseline Configuration pdf.

  • Early lead Sources Sought Posted May 5, 2026

    The description changed: 05 May 26 Added KC-135 CCR Baseline Configuration to Bidder's Library Added TO 00-5-16 to Bidder's Library Added In Per…

  • Early lead Sources Sought Posted May 5, 2026

    The description changed: 05 May 26 Added In Person Industry Day Measurements for KC-135 CCR Memo 28 Apr 26 Added In Person Industry Day Pictures…

  • Early lead Sources Sought Posted Apr 28, 2026

    No changes are visible in this extract. Check SAM.gov because the change may be in an attachment.

  • Early lead Sources Sought Posted Apr 28, 2026

    No changes are visible in this extract. Check SAM.gov because the change may be in an attachment.

  • Early lead Sources Sought Posted Apr 28, 2026

    The description changed: 28 Apr 26 Added In Person Industry Day Pictures KC-135 CCR Memo 23 April 2026 The following documents have been deleted…

  • Early lead Sources Sought Posted Apr 23, 2026

    No changes are visible in this extract. Check SAM.gov because the change may be in an attachment.

  • Early lead Sources Sought Posted Apr 23, 2026

    The description changed: 23 April 2026 The following documents have been deleted due to non-applicability and/or being outdated.

  • Early lead Sources Sought Posted Apr 23, 2026

    No changes are visible in this extract. Check SAM.gov because the change may be in an attachment.

  • Early lead Sources Sought Posted Apr 15, 2026

    The description changed: 15 April 2026 Updated the Q&A documents for SOW, SRD, and Industry Day with Government responses.

  • Early lead Sources Sought Posted Apr 15, 2026

    No changes are visible in this extract. Check SAM.gov because the change may be in an attachment.

  • Early lead Sources Sought Posted Apr 15, 2026

    No changes are visible in this extract. Check SAM.gov because the change may be in an attachment.

  • Early lead Sources Sought Posted Apr 7, 2026

    The description changed: 07 April 2026 NOTICE: AIRCRAFT TOUR ACCESS INFORMATION The Government is requesting the following arrival times for all…

  • Early lead Sources Sought Posted Apr 3, 2026

    The description changed: 03 April 2026 The Government is providing the following documents: The Q&As from the questions asked during the Virtual…

  • Early lead Sources Sought Posted Apr 3, 2026

    The description changed: 03 April 2026 The Government is providing the Q&As from the questions asked during the Virtual Industry Day and the one…

  • Early lead Sources Sought Posted Apr 3, 2026

    No changes are visible in this extract. Check SAM.gov because the change may be in an attachment.

  • Early lead Sources Sought Posted Apr 3, 2026

    The description changed: 03 April 2026 CCR Virtual Industry Day - March 2026: Q&A The Government is providing the Q&As from the questions asked …

  • Early lead Sources Sought Posted Apr 3, 2026

    No changes are visible in this extract. Check SAM.gov because the change may be in an attachment.

  • Early lead Sources Sought Posted Mar 27, 2026

    The description changed: 27 March 2026 CCR Virtual Industry Day -25 March 2026: Charts and Minutes for Industry The Goverment is providing the c…

  • Early lead Sources Sought Posted Mar 24, 2026

    No changes are visible in this extract. Check SAM.gov because the change may be in an attachment.

  • Early lead Sources Sought Posted Mar 19, 2026

    The description changed: 19 March 2026 Invitations for the morning session of the KC-135 Center Console Refresh Industry Day have been sent.

  • Early lead Sources Sought Posted Mar 17, 2026

    The description changed: 17 March 2026 NOTICE REGARDING DOCUMENT ACCESS Several documents that were previously located in the controlled section…

  • Early lead Sources Sought Posted Mar 16, 2026

    The description changed: 16 March 2026 INDUSTRY DAY SCHEDULING: The Government is finalizing preparations for the upcoming Industry Day.

  • Early lead Sources Sought Posted Mar 16, 2026

    No changes are visible in this extract. Check SAM.gov because the change may be in an attachment.

  • Early lead Sources Sought Posted Mar 16, 2026

    No changes are visible in this extract. Check SAM.gov because the change may be in an attachment.

  • Early lead Sources Sought Posted Mar 10, 2026

    No changes are visible in this extract. Check SAM.gov because the change may be in an attachment.

  • Early lead Sources Sought Posted Mar 10, 2026

    The description changed: 10 March 2026 The Government wants to notify offerors that the KC-135 Center Console Refresh (CCR) Revision 2 program h…

  • Early lead Sources Sought Posted Mar 4, 2026

    No changes are visible in this extract. Check SAM.gov because the change may be in an attachment.

  • Early lead Sources Sought Posted Mar 3, 2026

    No changes are visible in this extract. Check SAM.gov because the change may be in an attachment.

  • Early lead Sources Sought Posted Mar 3, 2026

    The description changed: 03 March 2026 The DRAFT Statement of Work (SOW) and System Requirements Document (SRD) for the KC-135 Center Console Re…

  • Early lead Sources Sought Posted Mar 3, 2026

    The description changed: 06 March 2026 The DRAFT Statement of Work (SOW) and System Requirements Document (SRD) for the KC-135 Center Console Re…

  • Early lead Sources Sought Posted Mar 3, 2026

    No changes are visible in this extract. Check SAM.gov because the change may be in an attachment.

  • Early lead Sources Sought Posted Feb 27, 2026

    The description changed: 27 February 2026 The DRAFT Section L and Section M for the KC-135 Center Console Refresh (CCR) Revision 2 program have …

  • Early lead Sources Sought Posted Feb 27, 2026

    No changes are visible in this extract. Check SAM.gov because the change may be in an attachment.

  • Early lead Sources Sought Posted Feb 18, 2026

    The description changed: 18 February 2026 Eighteen Technical Orders (TOs) have been uploaded.

  • Early lead Sources Sought Posted Feb 17, 2026

    The description changed: 17 February 2026 Updated non-CUI schedule for Industry: CCR plans to release Draft RFP – end of month February 2026 fol…

  • Early lead Sources Sought Posted Feb 5, 2026

    The description changed: 05 February 2026 Added document "(CUI) KC-135 SCG Final Oct 2022" -----------------------------------------------------…

  • Early lead Sources Sought Posted Jan 13, 2026 KC-135 Center Console Refresh (CCR) Revision 2

    The title is now “KC-135 Center Console Refresh (CCR) Revision 2”. The description changed: 13 January 2026 CCR Response to Industry Questions The Goverment is providing answers to the SRD and SOW questions subm…

  • Early lead Sources Sought Posted Dec 17, 2025

    The description changed: 17 December 2025 CCR Virtual Industry Day -2 April 2025: Chats for Industry The Goverment is providing the charts prese…

  • Early lead Sources Sought Posted Dec 17, 2025

    The description changed: 17 December 2025 CCR Virtual Industry Day -2 April 2025: Chats for Industry The Goverment is providing the charts prese…

  • Early lead Sources Sought Posted Dec 17, 2025

    No changes are visible in this extract. Check SAM.gov because the change may be in an attachment.

  • Early lead Sources Sought Posted Dec 5, 2025

    The description changed: 5 December 2025 REQUEST FOR INFORMATION (RFI) 3 The Goverment is seeking industry input concerning contract type and st…

  • Early lead Sources Sought Posted Nov 21, 2025

    The description changed: 21 November 2025 The DRAFT Statement of Work (SOW) for the KC-135 Center Console Refresh (CCR) Revision 2 program has b…

  • Early lead Sources Sought Posted Nov 19, 2025

    The description changed: 19 November 2025 An update has been added for the Center Console Refresh Revision 2 effort.

  • Early lead Sources Sought Posted Nov 14, 2025

    No changes are visible in this extract. Check SAM.gov because the change may be in an attachment.

  • Early lead Sources Sought Posted Nov 14, 2025

    The description changed: 14 November 2025 The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 pr…

  • Early lead Sources Sought Posted Sep 29, 2025

    The description changed: 29 September 2025 Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for rev…

  • Early lead Sources Sought Posted Sep 26, 2025

    The description changed: 26 September 2025 The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 p…

  • Early lead Sources Sought Posted Aug 28, 2025

    The description changed: 28 August 2025 An update has been added for the Center Console Refresh Revision 2 effort.

  • Early lead Sources Sought Posted Aug 13, 2025

    The description changed: 8 August 2025 Replaced attachment "OMG SysML Ver 1.

  • Early lead Sources Sought Posted Jul 18, 2025

    The description changed: 18 July 2025 Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".

  • Early lead Sources Sought Posted Jul 15, 2025

    The description changed: 15 July 2025 Partial Bidder's Library uploaded to give Industry access to data.

  • Early lead Sources Sought Posted Jul 2, 2025

    The response deadline moved to Jul 9, 2025 9:00 PM UTC.

  • Early lead Sources Sought Posted Jul 2, 2025

    The description changed: 2 July 2025 REQUEST FOR INFORMATION (RFI) 2 The Goverment is seeking additional information concerning incentives and C…

  • Early lead Sources Sought Posted Jun 6, 2025

    The description changed: 6 June 2025 Added additional Q&A from 2 April 2025 virtual Industry Day.

  • Early lead Sources Sought Posted Jun 6, 2025

    The response deadline moved to Jun 30, 2025 8:00 PM UTC.

  • Early lead Sources Sought Posted Apr 14, 2025

    The description changed: 14 April 2025 Added Q&A from 2 April 2025 virtual Industry Day.

  • Early lead Sources Sought Posted Apr 14, 2025

    The description changed: 14 April 2025 Added Q&A from 2 April 2025 virtual Industry Day.

  • Early lead Sources Sought Posted Apr 11, 2025

    No changes are visible in this extract. Check SAM.gov because the change may be in an attachment.

  • Early lead Sources Sought Posted Mar 7, 2025

    The description changed: 07 March 2025 KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025,…

  • Early lead Sources Sought Posted Feb 21, 2025

    The response deadline moved to Mar 24, 2025 8:00 PM UTC. The description changed: 21 February 2025 Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

  • Early lead Sources Sought Posted Jan 31, 2025

    First posting.