rfpseek Federal opportunities
Active Bid Combined Synopsis/Solicitation

Propulsion and Power of Naval Air Vehicles (FY27 BAA)

Solicitation N0042126S0002 Notice 1757e0a495ba43e5a5e1ddb87ab3c35a

The agency is asking for bids, quotes, or proposals. Check the notice for instructions and the deadline.

No confirmed award in the records available to us. That does not establish that bidding is still open. Award records can lag. DoD award records lag about 90 days.

Sign in to get updates for this solicitation.

Open official notice on SAM.gov
PostedSep 24, 2026
Due dateSep 30, 2027 7:00 AM UTC
DepartmentDEPT OF DEFENSE
Set-aside Unrestricted Unrestricted. No set-aside.

Scope

Opportunity description

1.0 PROGRAM OVERVIEW - The Naval Air Warfare Center Aircraft Division (NAWCAD) Air Systems Group, Propulsion and Power Engineering Department, is soliciting White Papers in response to the Governments Statement of Objectives.

For successful offerors, a Request for Proposal will be submitted, and a contract will subsequently be awarded off Broad Agency Announcement 2027 for Propulsion and Power of Naval Air Vehicles. Detailed information is provided in the NAVAIR publication - Guide to Naval Aviation Propulsion and Power Technology Development Programs for Fiscal Year 2027 - which is attached to this SAM.gov announcement. 2.0 TWO-STEP SUBMISSION PROCESS - Proposal submission process, format, content, and deliverable items are fully delineated in the attached NAVAIR Guide.

Step 1 (White Papers): Initial proposals or White Papers (WP) should not exceed 30 pages in length, including a cost estimate. Brevity is desirable: WPs ranging from 5 to 15 pages are the norm. Cost estimates for stand-alone subsets of effort are encouraged.

Step 2 (Formal Proposals): Offerors of those WPs found to be consistent with the intent of the BAA will be invited to submit a formal cost and technical proposal. One original copy of each formal cost and technical proposal is to be submitted upon invitation.

Submission Deadline: White Paper submissions are due by September 30, 2027. 3.0 EVALUATION CRITERIA - The technical and cost information will be evaluated concurrently by a panel of Government technical evaluators.

Selection for award will be based on the potential benefit to the Government weighed against the cost of the proposals, in view of the availability of Government funds. No further criteria beyond the following will be used: Primary Criteria: Scientific and Technical Merits: and Potential Navy Contributions.

Secondary Criteria (Of lesser importance, but equal to each other): Capabilities and Experience: and Cost. 4.0 CONTRACT TYPES and REPORTING REQUIREMENTS - Anticipated Contracts: Cost-Plus-Fixed-Fee (CPFF), Cost-Sharing, and Cost contracts are anticipated.

Other types of contracts may be proposed, but offerors are advised that the Government is under no obligation to accept them. Deliverables: Specific reporting requirements cited on the Contract Data Requirements List (DD Form 1423) shall be specified within each contract award.

At a minimum, all offerors will be required to submit:

  1. Detailed Planning Report:
  2. Progress Report:
  3. Financial Reports:
  4. Test Plans:
  5. Program Reviews:
  6. Presentation Material: and
  7. Final Report. 5.0 SUBMISSION and CONTACT INFORMATION - WPs and Proposals shall be submitted to the following Procuring Contracting Officers (PCO): Primary PCO: Stacey Stone (Email: stacey.l.stone9.civ@us.navy.mil), Secondary PCO: Sotanya Rushing (Email: sotanya.t.rushing.civ@us.navy.mil). Location: Patuxent River, MD 20670. Secure Submission: WPs and Proposals that include sensitive information can be submitted through DoD SAFE (https://safe.apps.mil/). 6.0 GOVERNMENT DISCLAIMERS - The Navy reserves the right to select for award any, all, part of, or none of the responses received and intends to fully fund any resultant contract(s), depending on available funding. The Government will not pay any proposal preparation costs for responding to this Broad Agency Announcement. Responses should be forwarded at no cost to the Government. The cost of preparing proposals in response to this BAA is not considered an allowable expense to the normal bid and proposal indirect cost as specified in FAR 31.205-18.

FAR references

These Federal Acquisition Regulation references appear in the notice description.

Links open the current FAR text on Acquisition.gov. Check the full solicitation on SAM.gov for clause dates, alternates, deviations, and additional clauses in attachments.

Timeline

Related notices

2 notices