Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB

Solicitation RFP-376508-CD Notice 14034cd5817d49c38056351ef936d097

The agency is asking for bids, quotes, or proposals. Check the notice for instructions and the deadline.

No confirmed award in the records available to us. That does not establish that bidding is still open. Award records can lag.

Sign in to get updates for this solicitation.

Open official notice on SAM.gov
PostedOct 7, 2026
Response deadlineNov 17, 2026 10:00 PM UTC
DepartmentENERGY, DEPARTMENT OF
Set-aside Unrestricted Unrestricted. No set-aside.

Scope

Opportunity description

On October 7, 2026, Amendment No. 2 was issued to correct badge access link provided in Amendment No. 1. On October 6, 2026, Amendment No. 1 was issued to provide dates for site visits. This scope of work is to build an addition and renovate the Central Utility Building (CUB).

The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements.

It is vital to Fermilab’s mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications.

All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein.

The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab.

The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window. This project includes the following milestones: Milestone 1 – Issuance of Notice to Proceed (NTP) to 30th December 2027.

This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement. Milestone 2 – 3rd January 2028; This milestone marks the point where construction work may begin.

Milestone 3 – 31st January 2029; AUP 1 CUB Extension complete. Milestone 4 – 29th June 2029; AUP 2 Existing CUB Upgrade complete. Milestone 5 – 28th September 2029; Completion of CUB- including all remedial work following removal of site trailers.

Timeline

Related notices

3 notices
  • Bid Solicitation Posted Oct 7, 2026 You are viewing this

    The description changed: On October 7, 2026, Amendment No.

  • Bid Solicitation Posted Oct 6, 2026

    The description changed: On October 6, 2026, Amendment No.

  • Bid Solicitation Posted Sep 17, 2026

    First posting.